Open Expansion Tank

For MTA TAEevo product line only
  • Facilitates cooling loop filling by manually pouring coolant into external reservoir
  • Provides a visual indication of coolant level and top-off convenience
  • Must be installed at the highest point of the coolant loop to avoid overflow possibility
openexpansiontankkit Instructions:
  1. Install components as shown making sure that valves A & B are open and valve C is closed.
  2. Add water or water-coolant mixture into the tank opening D.
  3. Continue filling slowly until a level is maintained at about half of the expansion tank volume.
  4. Operate the chiller pump to circulate coolant throughout the coolant loop.
  5. Add coolant as required to maintain a steady level in the tank and top off as needed.
 

Copyright © 2020 Industrial Water Chiller - All Rights Reserved

Operating Hours:

Monday-Friday 7:30am – 5:30pm

Phone: 1-800-934-0785 

Email: [email protected]

Address: 120 Nowlin Lane

Chattanooga, TN 37421